CASE STUDY
GARDEN OF PUTAIN
PBL PUSH-UP BRAS

SAMPLE TIME
12 DAYS
PRODUCTION TIME
7 WEEKS
TOTAL UNITS
20,000
COLORWAYS
3
WHAT WE DELIVERED
01
THE BRIEF
GARDEN OF PUTAIN NEEDED PBL PUSH-UP BRAS WITH PROPRIETARY LIFT ENGINEERING FOR THEIR DEBUT COLLECTION. 3 COLORWAYS, PREMIUM MATERIALS, A DESIGN THAT HAD NEVER BEEN MANUFACTURED BEFORE.
02
DEVELOPMENT
CUSTOM PATTERNS ENGINEERED FROM SCRATCH. MATERIALS SOURCED, SAMPLES PRODUCED AND APPROVED WITHIN 12 DAYS.
03
PRODUCTION
20,000 BRAS MANUFACTURED USING A FIRST OF ITS KIND CONSTRUCTION. EVERY UNIT INSPECTED FOR STITCHING, FIT CONSISTENCY, AND MATERIAL QUALITY.
04
DELIVERY
BRANDED PACKAGING DESIGNED TO MATCH THE PREMIUM POSITIONING. FULL ORDER SHIPPED WITH FREIGHT AND CUSTOMS HANDLED END TO END.